Back to Archives

Archives ยท 1003.01.172

MV pathways stabilized top dressing procedure

Morlatton

Images

Description

Morlatton Village Pathways Stabilized Screenings Top Dressing Mixer Procedure 1. Thoroughly dry aggregate before mixing with stabilizer; 2. Mix dry stabilizer with dry aggregate at ratio of 15 ibs. stabilizer to ton of aggregate ,complete blending mechanically with closed paddle mixer to avoid loss of fines from both stabilizer [all fines] and aggregate; mix until stabilizer permeates all aggregate volume. Image #2 shows the mixing calculation with use of buckets of known dimensions. 3. Spread mixture to at least 3'' on solid and leveled bed covered with a woven separating geo-fabric [see section drawing] 4. Screed to level with cambered midline for drainage; 5. Saturate dressing thoroughly with water for catalytic reaction; 6. Roll surface after partial drying to walkable density and compaction. Larry Ward, September,2017

Catalog details

Catalog number
1003.01.172
Alternate number
MVTXT11
Accession number
1003.01
Date
September 2017
Object name
Machine, Concrete-finishing
Record type
Archive
Classification
Masonry & Stoneworking T&E

Subjects and search terms