Back to Archives

Archives ยท 1008.01.066

Sites and Structures Report, April 2014

Sites and Structures Reports

Images

Description

HPTBC Sites & Structures Report, April, 2014 1. Mower storage shed [donated by Lowe's] located off Swede's Lane; installed on stone base and tamped gravel top-dressing; floor joists screwed to 4"x 6" locust sleepers bedded in gravel. Ratify email approval of mower purchase, 0%-financed by Shelley Fund, quarterly, 5 yrs.; insurance coverage on shed, and mower as "contents", bound. Need Thank-You letter to Lowe's store #2819, Exeter Township. 2. Removal and scrapping of heating ducts & equipment from 1765 GDH cellar; probably break-even financially. 3. DTH roof tiles replaced and door hasp re-set in jamb by Lainhoffs. A. Archaeology projects: Chapter 21, Society for Pennsylvania Archaeology volunteers contributed over 1600 hours to Trust projects during 2013. B. WH & GDH trench backfilling and "salvage" dig-to be completed by June [GDH soil will be re-located for future screening]. Sites will be graded and seeded. C. MJH interior units-postpone until structural project completed. D. MJH exterior dig north of existing excavations will be back-filled to provide solid and level base for shoring structure [back-filling completed in several units]; foundation will be consolidated and mortared before wall is dismantled. E. 5 foot wide trench excavation to follow sub-grade wall-alignment northward. Keim House: A. balcony and railing detail drawing attached [Image #1]. Approval requested for temporary square balusters until more evidence is discovered. B. Entry structure: propose post-and-board [no balusters] for stair and landing- Approval requested. C. Carpenter-Joiners Tom & Chris Lainhoff propose PA-German clay tiles for the KH pent roof [framed], with capped hips based on European precedents. Should re-roof road-side pent with tiles as well. 4. MJH preliminary shoring design drawings [Image #2] submitted to Engineer [Tim Hoyer of Timbertech Engineering, Denver, PA.]. Have received his revision, now under discussion. Request authority for S & S committee to approve and construct final shoring design in consultation with Engineer. See record #MJHDWG3 for images of final approved Timbertech plans and discussion of shoring details and functions. Q: Add raking braces inside corners opposing thrust? Respectfully submitted, L. Ward, Restoration Projects Coordinator Laurence Ward, October 2016, Updated Oct. 2020

Catalog details

Catalog number
1008.01.066
Alternate number
HPTSSR21
Accession number
1008.01
Date
April 2014
Object name
REPORT
Record type
Archive
Classification
Documentary Artifact

Subjects and search terms