Sites and Structures Report-GDH, June 30,2018

Sites and Structures Reports

Images

Description

George Douglass House Project Work April 1 to June, 30, 2018: During the 2d quarter of 2018, restoration carpenters Tom and Chris Lainhoff achieved significant progress toward restoring safe, stable, and historically and architecturally authentic flooring in the northwest ["best"] parlor of the house. A majority of the original floor boards have been preserved and structurally consolidated. The restored and replacement boards [Image #1, photo 1, 5/12/18] will be re-set on mostly original joists, which have been extended where joist-ends had rotted, and have been reinforced and extended ("sistered") where necessary [Image # 2, photo #56, 4/9/18]. The stabilized joists were then re-set in bearing sockets in the masonry foundation walls, or joined with tenons into mortises in the short diagonal beams parallel to fireplace hearths [Image #3, photo 28, 4/3/18], or bedded on a timber plate supporting joists and borne by the stone pier wall under the board partition between parlors [Image #4, photo 48, 4/15/18]. An arched stone vault in each parlor-cellar supports the corner fireplace hearth [Image #5, photo 21, 4/13/18]. The original (and some replacement) boards were re-leveled to the original plane of the adjacent center-passage/hallway [see Image #1]. Old tongued-and-grooved boards of the same species of poplar as the originals were acquired from regional sources and padded-out on their under-sides to meet the re-leveled floor-plane. Considerable shop-work was required to achieve an acceptably functional stability and dimensional conformity between the original boards and the replacements. Cutouts in the flooring for 19th century heating vents and stove-pipes will be patched-in, utilizing the nearly invisible joinery methods applied by the Lainhoffs in the hallway floor restoration. This process will complete the floor system in the formal northwest parlor and will afford a set of gauged datum points as calibrated references for the wainscot and other paneling, millwork elements, and plasterwork to be restored to walls and ceilings. Degraded and late-period plaster has been removed from wainscot and upper wall ranges to prepare for re-plastering with traditional lime plaster, commencing in the 3d quarter of this year. Laurence Ward, December 2020

Catalog details

Catalog number
1008.01.081
Alternate number
HPTSSR36
Accession number
1008.01
Date
June 30, 2018
Object name
Report
Record type
Archive
Classification
Documentary Artifact

Subjects and search terms