Back to Photos

Photos · 1001.01.230

Cellar-kitchen exterior steps construction

DeTurk

Images

Description

Series of 32 digital photographs showing the construction of the exterior stone steps to the lower-grade level kitchen doorway at the DeTurk House. Full captions for numbered photos appear below. June 14, 2010 2634: Brittle top layer of limestone bedrock found 18" below top of door sill. 2635: Chipped and fractured bedrock stratum under door sill. 2636: White-veined blue limestone bedrock at bottom of excavation for staircase. This is the same [Dolomitic] limestone under most of the Oley Valley; in a quarry about 2 miles to the south, where the “table” of stone is about 400 feet thick to the base of the quarry face. 2637: White-veined blue limestone bedrock at bottom of excavation for staircase. 2638: Sizing and cutting geo-textile filter fabric for stone-bed underlayment. 2639: Geo-textile fabric covering bedrock. 2640: Loading "2B" clean stone onto geo-textile fabric. 2641: Leveling 2B stone bed. June 15, 2010 0001: Rubber-tracked Kubota 161 Mini-Excavator mobilized to excavate, set bed-stones, step-blocks, landings, and risers forming the staircase. 0002: Lower limestone landing ["L1"-see Field Notes sketch-drawings DTR09FN4--1001.01.231 & DTR09FN5--1001.01.232], which is 41inches x 22 inches x 4 inches, set on irregular ("rock-face") limestone bed stone ["B1"] to support L1 [lower landing, against sill] and CD1 [lower channel drain, at same elevation as L1]. 0009: 30 inches x 56 inches x 8 inches limestone bed-stone ["B3"], positioned as shown in DTR09FN5--1001.01.232 to provide continuous solid support from bedrock upward through bed-stones, which bear step-blocks ["landings"], risers, and channel drains. 0016: L1, R1 [granite riser] & B3 set in final alignment on 2B stone and screenings leveling bed, and CD1, set in a lime mortar bed with mortared [vertical] side-joints capped with screenings. 0017: 360 degree leveling laser used to set elevations of landings and channel drain grates, using top of sill at north door jamb as reference datum. 0019: 38" x 22" x 4" with one of its larger surfaces on (irregular "rock-face") limestone bed stone ["B2"] to support upper limestone step-block ["L2"] and CD2 [upper channel drain]. 0020: setting B2. 0023: setting and leveling B2 on stone screening bed. 0026: setting and leveling L2 on stone screening bed. 0030: Grappling granite bed-stone [ "B4", 38" x 22" x 8"] into position, with 2-plate "thumb" attachment, to support sandstone landing ["L3"], which is 40" x 29" x 8". 0031: Transporting B4 down embankment to staircase excavation. 0032: Preparing to set B4 in place. 0033: screenings bed leveled to receive bed-stone B4. 0037: B4 in place and leveled on screenings bed. 0052: L3 grappled with excavator bucket and "thumb" to its site. 0054: leveling L3. 0058: Setting mortar bed for CD2. 0063: Troweling mortar into joints flanking CD2. 0064: Screening caps on channel drain mortar joints. September 7, 2009 1084: East eaves wall detail and kitchen doorway prior to completion of staircase, retaining wall, and drains protecting doorway and foundation walls. July 3, 2010 104: East eaves wall detail and kitchen doorway after completion of staircase, retaining wall, and drains protecting doorway and foundation walls Laurence Ward, 2009, UPDATED Oct 2021 and September, 2022

Catalog details

Catalog number
1001.01.230
Alternate number
DTR09PH134
Accession number
1001.01
Date
09/07/2010 thru 07/03/2010
Creator
Larry Ward
Object name
Print, Photographic
Record type
Standard
Classification
Documentary Artifact

People

Subjects and search terms