Temporary shoring ["centering"] frame supporting DeTurk cellar vault (2009)
Photos 1001.01.226

Temporary centering frame for vault arch

DeTurk · 07/21/2009

Temporary shoring [”centering” {1}] frame supporting root cellar vault during restoration of vault abutment wall. This is the upper segment with a sheet of plywood ”scribed” to the ”intrados”{2}. FOOTNOTE {1} "Centering" (“false-work” in early usage) is the term customarily applied to the timber frame supporting an arch or vault during construction until

View record
Temporary shoring ["centering"] frame supporting DeTurk cellar vault (2009)
Photos 1001.01.227

Temporary centering frame for vault arch

DeTurk · 07/24/2009

Lower elements of the temporary shoring ["centering" {1}] frame supporting the root cellar vault during restoration of vault abutment wall. See DTR09PH130--1001.01.226 showing the upper portion of this shoring frame. FOOTNOTE {1} “Centering” [“false-work” in early usage”] is the term customarily applied to the timber frame supporting an arch or vault dur

View record